DRIVING PERSPECTIVE BLOG

Shedding Light on How Daylight Saving Time Impacts Road Safety

Changing Driver Behavior, Featured
Aug 14/2018 Published by: Lytx Lytx Telematics

Daylight Saving Time begins March 11. That means we’ll all lose an hour of sleep. And there are other things about the time change to lament besides a little less shut eye. The beginning of Daylight Saving Time actually brings with it dangerous side effects related to road safety.

Lytx VP of Safety Services Del Lisk explains why the Monday morning and evening commutes after a time change are so challenging for drivers (and how fleet safety managers can ensure their drivers turn in safe and sound Monday night).

  1. Fatigued drivers behind the wheel could be more prone to collisions. While people may lose an hour of sleep on Saturday night, it may not change what time they go to bed. Problem is, “by the time people go back to work on Monday, the body hasn’t adjusted to the new sleep schedule,” Lisk said. That means Monday morning drivers tend to be more fatigued, less alert, and have slower reaction times, Lisk said. And the evening commute isn’t much better.

    A 2016 University of Colorado Boulder study found that collisions spike in the days following a time change. “At the very least, greater fatigue leads to less attentive driving,” Lisk said. “If traffic is slowing ahead, a fatigued driver is likely to recognize the slowdown late, and it could result in a rear-end collision. By Monday morning, the body and mind have not adjusted to the time change, and it can show in drivers’ slower reaction times.”

    A tired driver also is less likely to scan mirrors, Lisk said, increasing the chances of a driver to change lanes without looking or be surprised by the maneuvers of other drivers.

  2. A change in daylight patterns affects circadian rhythms. A Society for Neuroscience study found that disruption of the day and night cycle leads to weight gain, impulsive behavior and slower thinking, among other problems. With a disrupted sleep cycle, Lisk said, “again, fatigue increases—and in congested end-of-day traffic where pedestrians, road markings and potholes are harder to see in the dark. It creates a dangerous situation,” especially considering that nearly three out of four pedestrian deaths occur at nighttime and distracted pedestrians are on the rise.

  3. Beware the angle of the sun. The onset of Daylight Saving Time means drivers heading to work will be on the road an hour later than usual Monday morning, when the sun is positioned differently than what drivers are used to. That means the sun could be shining directly into your drivers’ eyes when they’re starting their workday. With more fatigued drivers on the road and potentially diminished visibility, “it makes for a bad cocktail,” Lisk said.

So how can drivers adjust to these challenges? By remembering three simple S’s, Lisk said:

  1. Schedule. Encourage them to start their journey a few minutes earlier so they’re not feeling rushed—about 15 minutes earlier should suffice. “When drivers are rushed, they tend to feel anxious and make poor decisions,” Lisk said.

  2. Speed. Have them reduce their speed by about five to 10 miles per hour, Lisk said. It’s a simple move that gives drivers more reaction time. If your drivers are driving at a slower speed, they’ll have more time to respond and won’t require as much stopping distance.

  3. Space. Remind them to leave extra space between themselves and the vehicle ahead. The extra space provides a greater buffer to protect against collisions in the morning rush hour and gives drivers additional time to safely see, think and act. Bonus tip: To prepare for the time change, drivers could set their alarms a bit earlier on Friday and Saturday mornings before the time change, Lisk said. It will make it easier for them to be ready for Monday morning.

Like what you’ve read? Subscribe to our blog and be the first to receive our updates!

# # #


Related Tags

Related Blog Posts

Sep 24 / 2015Changing Driver Behavior, Featured

Changing Habits by Retraining Muscle Memory

Staff Writer

Sep 03 / 2015Changing Driver Behavior

Risk is a Consequential Matter

Staff Writer

Sep 01 / 2015Changing Driver Behavior

Innovation as a Business Focus

Staff Writer

Aug 20 / 2015Changing Driver Behavior

What Professional Drivers Learn From Their Coaches

Staff Writer

Jul 24 / 2015Changing Driver Behavior, Featured

Big Data, Better Drivers

Staff Writer

Feb 25 / 2015Changing Driver Behavior

Why Cheaper Gas Prices Could Put Your Safety At Risk

Staff Writer

May 16 / 2018Driving in the 21st Century, Featured

Predictive Analytics: A Game Changer in 2018

Staff Writer

Nov 03 / 2014Changing Driver Behavior, Featured

Adjusting to Standard Time

Del Lisk

Sep 15 / 2014Changing Driver Behavior

Driver Appreciation Week

Staff Writer

Sep 05 / 2014Changing Driver Behavior

Distracted Driving Forecast: Sunny with a chance of collision?

Del Lisk

Nov 02 / 2013Changing Driver Behavior

Lytx: The Power of Data Blog

Staff Writer

Apr 04 / 2013Changing Driver Behavior

Video Telematics: Seeing is Believing

Del Lisk

Aug 13 / 2012Changing Driver Behavior

What Will Really Deter People From Engaging in Distracted Driving?

Dr. Jeffrey Hickman

Jul 25 / 2012Changing Driver Behavior

There are No Short-Term Initiatives … that Work!

Del Lisk

Mar 09 / 2012Changing Driver Behavior

Is Distracted Driving Decreasing or Are We Hiding Distractions?

Dr. Jeffrey Hickman

Jan 26 / 2012Changing Driver Behavior

Fleet Safety: Following Too Closely

Del Lisk

Nov 29 / 2011Changing Driver Behavior

Habits

Michael Richter

Mar 15 / 2011Changing Driver Behavior

Fleet Safety: The Most Common Risky Driving Behaviors

Del Lisk

Dec 22 / 2010Changing Driver Behavior

Looking Farther Down the Road

Del Lisk

Nov 23 / 2010Changing Driver Behavior

One Simple Step to Reducing Truck Crashes

Del Lisk

Oct 24 / 2010Changing Driver Behavior

Blind Trust

Del Lisk

Jan 03 / 2011Changing Driver Behavior

Fleet Safety: Danger in the Parking Lot

Del Lisk

Feb 01 / 2011Changing Driver Behavior

Make Driving a Game

Del Lisk

Oct 10 / 2011Changing Driver Behavior

Safety Culture: What is it and How does it Affect Fleet Safety?

Global Administrator

Sep 09 / 2012Changing Driver Behavior

Thank a Truck Driver (or two)

Staff Writer

Feb 28 / 2011Changing Driver Behavior

The Dangers of an Open Lane

Del Lisk

Feb 02 / 2015Changing Driver Behavior

How do you define ‘behavior’?

Caroline Hurst

Sep 20 / 2013Changing Driver Behavior

Lorry Driving: one of the UK’s riskiest jobs

Paul Jones

Oct 22 / 2015Changing Driver Behavior

Lytx – Proud Supporters of Brake Road Safety Week

Caroline Hurst

Apr 19 / 2014Changing Driver Behavior

Reading between the guidelines

Caroline Hurst

Sep 05 / 2014Changing Driver Behavior

Prevention is the Best Cure

Caroline Hurst

Nov 03 / 2014Changing Driver Behavior

The positive feedback loop

Caroline Hurst

May 23 / 2016Changing Driver Behavior, Featured

Retraining to Retain Your Drivers

Staff Writer

May 25 / 2016Changing Driver Behavior, Featured

Taking the Risk Out of One of the Riskiest Professions

Staff Writer

Jun 01 / 2016Changing Driver Behavior, Featured

Heinrich’s Pyramid Challenge: 190 to 1 in an Instant

Staff Writer

Jun 03 / 2016Changing Driver Behavior, Featured

Why Hands-Free Phones Still Lead to Distractions & Collisions

Staff Writer

Jun 15 / 2016Driving in the 21st Century, Featured

How Gamification Optimizes Driving & Vehicle Performance

Staff Writer

Jun 23 / 2016Changing Driver Behavior, Featured

Who – or What -- Does the Heavy Lifting to Improve CSA Scores?

Staff Writer

Jul 07 / 2016Changing Driver Behavior, Featured

Top 3 Ways Proactive Fleet Managers Build a Safety Program

Staff Writer

Jul 08 / 2016Choosing the Right Program, Featured

Meet Janelle: The Cone Destroyer

Staff Writer

Jul 27 / 2016Changing Driver Behavior, Choosing the Right Program, Featured

Using Data to Prioritize Your Fleet’s Safety Issues

Staff Writer

Jul 29 / 2016Changing Driver Behavior, Featured

Driving for the Limits of Automated Technology

Brandon Nixon

Aug 18 / 2016Choosing the Right Program, Featured

DOT Regulations: From the Same Government Who Brought You the Tax Code

Staff Writer

Aug 24 / 2016Changing Driver Behavior, Featured

Why Unsafe Drivers Are Often the Biggest Fuel Offenders

Staff Writer

Sep 08 / 2016Choosing the Right Program, Featured

Hours of Service, Driver Behavior and the ELD Mandate: American Central Transport’s Story

Staff Writer

Sep 26 / 2016Changing Driver Behavior, Featured

Fleet Safety: The Dangers Lurking Inside Your Fleet

Staff Writer

Oct 19 / 2016Changing Driver Behavior, Featured

The Hallmark of a Successful Video-based Safety Program

Staff Writer

Oct 28 / 2016Choosing the Right Program, Featured

What You Might Not Know About the ELD Mandate

Staff Writer

Nov 01 / 2016Changing Driver Behavior, Featured

Fleet Safety: Putting a Stop to Rolling Stops

Staff Writer

Nov 09 / 2016Changing Driver Behavior, Featured

The Three Types of Distracted Driving – and How to Solve Them – Part 1: Manual Distractions

Staff Writer

Nov 15 / 2016Changing Driver Behavior, Featured

The Three Types of Distracted Driving – and How to Solve Them – Part 2: Visual Distractions

Staff Writer

Nov 23 / 2016Changing Driver Behavior, Featured

Distracted Driving Behaviors – and How to Solve Them – Part 3 Cognitive Distractions

Staff Writer

Dec 06 / 2016Capitalizing on Your Investment, Featured

Making a Case for Video Part 1: The Value of Video in Litigation

Staff Writer

Dec 16 / 2016Choosing the Right Program, Featured

Making a Case for Video Part 2: Exoneration From The Driver’s Seat

Staff Writer

Dec 22 / 2016Capitalizing on Your Investment, Featured

Making a Case for Video Part 3: The Company and the Courtroom

Staff Writer

Jan 10 / 2017Changing Driver Behavior, Featured

Three Things That Put Teeth in Your Safety Policy

Staff Writer

Feb 01 / 2017Changing Driver Behavior, Featured

Effective Video Review: Better Coaching

Staff Writer

Feb 28 / 2017Changing Driver Behavior, Featured

High-Efficiency Driving: Five Driver Behaviors that Reduce Cost

Staff Writer

Mar 02 / 2017Capitalizing on Your Investment, Featured

What’s a Safety Halo? And Can it Help Build Your Brand?

Staff Writer

Mar 22 / 2017Choosing the Right Program, Featured

From the Front Lines: Turning Data into Insight

Staff Writer

Mar 24 / 2017Changing Driver Behavior, Featured

Part 2: Using DriveCam® Event Data to Drive More Effective Coaching

Staff Writer

Mar 28 / 2017Featured

Part 3: Getting Drivers and Managers to Buy into Analytics

Staff Writer

Apr 14 / 2017Changing Driver Behavior, Driving in the 21st Century, Featured

Autonomous Vehicle Essentials You Need to Know Part One: Levels of Automation

Staff Writer

Apr 18 / 2017Changing Driver Behavior, Driving in the 21st Century, Featured

Autonomous Vehicle Essentials You Need to Know Part Two: Impact on Drivers, Fleets and the Industry

Staff Writer

May 30 / 2017Featured

A Safety Manager Uses Math to Look Under the Surface

Staff Writer

Jun 07 / 2017Changing Driver Behavior, Featured

A Swift Guide to Better Coaching

Staff Writer

Jun 26 / 2017Driving in the 21st Century, Featured

How ‘Cultural Novocain’ is Numbing Outrage to Traffic Fatalities

Staff Writer

Jun 30 / 2017Changing Driver Behavior, Featured

A Practical Guide to Coaching Through Conflict

Staff Writer

Jul 06 / 2017Changing Driver Behavior, Featured

Why Putting Positivity Behind Your Training Program Will Pay Off

Beth Geraci

Jul 13 / 2017Changing Driver Behavior, Featured

Mobile Fire Department - Lytx Coach of the Year

Beth Geraci

Jul 17 / 2017Driving in the 21st Century, Featured

More Fatalities Happen on Rural Roads - On Either Side of the Atlantic

Beth Geraci

Jul 20 / 2017Capitalizing on Your Investment, Featured

Secrets of Top Performing Fleets

Staff Writer

Jul 25 / 2017Capitalizing on Your Investment, Featured

The Power of Peers to Inform Fleet Safety

Beth Geraci

Aug 10 / 2017Driving in the 21st Century, Featured

Distracted Pedestrians are On the Rise: What to Do About Them

Staff Writer

Aug 16 / 2017Changing Driver Behavior, Driving in the 21st Century, Featured

Fear of Autonomous Vehicles – Loving of Autonomous Features

Staff Writer

Aug 31 / 2017Changing Driver Behavior, Featured

Is Your Rewards Program a Bust? Get a New Approach

Staff Writer

Sep 01 / 2017Driving in the 21st Century, Featured

Trucking Industry Pulls Together to Aid Houston During Hurricane Harvey

Staff Writer

Sep 08 / 2017Changing Driver Behavior, Featured

Video Event Recorders Can Protect One’s Livelihood

Beth Geraci

Sep 15 / 2017Changing Driver Behavior, Featured

Components of Effective Accountability Systems

Staff Writer

Sep 22 / 2017Changing Driver Behavior, Featured

What’s Out There: Three Rewards Programs That Work

Staff Writer

Sep 25 / 2017Driving in the 21st Century, Featured

Video: Evolution, Revolution, or Both?

Brandon Nixon

Oct 06 / 2017Capitalizing on Your Investment, Featured

Why Reporting Claims Quickly Can Significantly Cut Claims Cost

Staff Writer

Oct 10 / 2017Driving in the 21st Century, Featured

Painting the Complete Picture: The Use of Witnesses in Trials

Staff Writer

Oct 16 / 2017Capitalizing on Your Investment, Featured

Four Driver Behaviors That Consume The Most Fuel

Staff Writer

Oct 19 / 2017Changing Driver Behavior, Featured

The Worst 'Crash' Ever

Staff Writer

Oct 24 / 2017Changing Driver Behavior, Featured

Can We Reverse the Trend of Road Fatalities? New Figures Give One Safety Official Hope.

Beth Geraci

Nov 03 / 2017Changing Driver Behavior, Featured

Daylight Saving Time: More Light Has a Dark Side for Road Safety

Beth Geraci

Nov 07 / 2017Capitalizing on Your Investment, Featured

Communications 101: Seven Steps to Successfully Spreading the Word

Staff Writer

Nov 10 / 2017Choosing the Right Program, Featured

Owner’s Guide to Creating a Medium-Sized Fleet Safety Program

Beth Geraci

Nov 16 / 2017Changing Driver Behavior, Featured

Five Sources of Aggressive Driving and What You Can Do About It

Staff Writer

Nov 20 / 2017Capitalizing on Your Investment, Featured

Seven Safety Quagmires and How to Sidestep Them

Staff Writer

Nov 29 / 2017Changing Driver Behavior, Featured

Gunning It: 6 Facts on Why to Avoid Hard Accelerations

Beth Geraci

Dec 06 / 2017Featured

The Interplay Between Leadership and Technology

Staff Writer

Dec 13 / 2017Driving in the 21st Century, Featured

How Safety Technology is Paving the Way to Zero Collisions

Beth Geraci

Dec 15 / 2017Driving in the 21st Century, Featured

Catching the Spirit of the Season

Beth Geraci

Dec 19 / 2017Capitalizing on Your Investment, Featured

12 Days of Takeaways

Beth Geraci

Dec 27 / 2017Driving in the 21st Century, Featured

Out of Control: Drugged Driving Is on the Rise. Here’s What Commercial Drivers Can Do About It.

Beth Geraci

Jan 15 / 2018Changing Driver Behavior, Featured

Navigating the Risks of Navigation Devices

Beth Geraci

Jan 22 / 2018Changing Driver Behavior, Featured

Four Ways the DriveCam Program Backs Up Drivers

Beth Geraci

Feb 02 / 2018Driving in the 21st Century, Featured

Off Site but on Top of It: Leveraging Video Telematics to be in More Places at Once

Staff Writer

Feb 07 / 2018Driving in the 21st Century, Featured

2018 Automotive Telematics Trends: A Look at the Telematics Industry

Beth Geraci

Feb 16 / 2018Changing Driver Behavior, Featured

Reflections on Using Mirrors When Driving

Beth Geraci

Feb 21 / 2018Driving in the 21st Century, Featured

What 20 Years of Innovation Looks Like at a Video Telematics Company

Beth Geraci

Mar 16 / 2018Changing Driver Behavior, Featured

6 Defensive Driving Tips for St. Patrick’s Day

Beth Geraci

Mar 29 / 2018Changing Driver Behavior, Driving in the 21st Century, Featured

Driver of the Year Embraces Safety Technology

Beth Geraci

Apr 13 / 2018Driving in the 21st Century, Featured

Complying With the ELD Mandate: What’s Next?

Staff Writer

Apr 27 / 2018Driving in the 21st Century, Featured

Distracted Driving Awareness: Curbing the Power of Smartphones

Beth Geraci

May 03 / 2018Changing Driver Behavior, Featured

A Driving Coach Can Bring A Human Approach to the Vision Zero Initiative

Staff Writer

May 08 / 2018Changing Driver Behavior, Featured

When Safety Is a Family Affair, Work-Related Injuries Can Be Avoided

Beth Geraci

May 14 / 2018Changing Driver Behavior, Featured

Five Top Tips from A Top Driving Coach

Beth Geraci

May 23 / 2018Driving in the 21st Century, Featured

Five Benefits of Modern Fleet Tracking Systems

Staff Writer

May 31 / 2018Driving in the 21st Century, Featured

Safety Technology and the NTSB: How Video Impacted an Investigation

Beth Geraci

Jun 06 / 2018Driving in the 21st Century, Featured

Stricter Enforcement Makes ELD Compliance More Vital

Beth Geraci

Jun 20 / 2018Driving in the 21st Century, Featured

Where Will the Transportation Industry Be in 20 Years?

Beth Geraci

Jul 11 / 2018Changing Driver Behavior, Featured

A 3-Step Guide to Proactive Coaching for Fleet Managers

Beth Geraci

Jul 31 / 2018Changing Driver Behavior, Featured

The Man Who Takes Fleet Driver Safety to Heart

Global Administrator

Aug 08 / 2018Changing Driver Behavior, Featured

National Truck Driving Championships: Roping a Win for Fleet Safety

Beth Geraci

Aug 22 / 2018Changing Driver Behavior, Featured

3 Ways the American Safety Council Helps Keep Roads Safer

Staff Writer

Jan 18 / 2018Driving in the 21st Century, Featured

Best of the Blog 2017

Beth Geraci

Sep 10 / 2018Driving in the 21st Century, Featured

Women in Trucking: Jodi Edwards Leads by Example

Beth Geraci

Sep 19 / 2018Capitalizing on Your Investment, Featured

5 Driver Retention Strategies that Work

Staff Writer

Oct 15 / 2018Changing Driver Behavior, Featured

Why Near-Collision and Near-Miss Analysis Matters

Staff Writer

Nov 01 / 2018Choosing the Right Program, Featured

6 Ways to Get More from Your Backup Cameras

Staff Writer

Nov 07 / 2018Changing Driver Behavior, Driving in the 21st Century, Featured

Drowsy Driving Prevention Strategies

Staff Writer

Nov 08 / 2018Featured

The FMCSA Crash Preventability Demonstration Program

Staff Writer

Nov 12 / 2018Featured

McLane’s Warriors to Wheels Gives Veterans Opportunities

Staff Writer

Nov 29 / 2018Driving in the 21st Century, Featured

Data Mining & Machine Learning: The Future of Transportation

Staff Writer

Dec 11 / 2018Capitalizing on Your Investment, Featured

How to Reduce Workers’ Comp Claims — and Boost Driver Retention

Staff Writer

Dec 18 / 2018Featured

20 Years and a Patent Portfolio Full of Innovation

Staff Writer